Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2

Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2

 

Hull and wheelhouse

Roberts Coastworker 30 MK2 semi displacement - internal framing

Internal Framing

 

Roberts Coastworker 30 MK2 semi displacement - rails installed

Rails installed. Note the splash rail the Graham has installed.

 

Roberts Coastworker 30 MK2 semi displacement - notice the 1/2 pipe rub rail

And the 1/2 pipe rub rail aft.

 

Roberts Coastworker 30 MK2 semi displacement - extended wheelhouse 01

Above and below. Three shots of this fine vessel showing the extended
wheelhouse Graham has created..

 

Roberts Coastworker 30 MK2 semi displacement - extended wheel house 02

 

Roberts Coastworker 30 MK2 semi displacement - extended wheelhouse 03

A truly fine job.

 

 

 Nearly finished interior

Roberts Coastworker 30 MK2 semi displacement - interior taking shape

With only approximately six weeks to the launching everything is taking shape.

 

Roberts Coastworker 30 MK2 semi displacement - looking into V berths

Looking forward down into the V berths.

 

Roberts Coastworker 30 MK2 semi displacement - steering station

Neat and functional steering station.

 

Roberts Coastworker 30 MK2 semi displacement - electrical wiring

A few loose ends to fix!

 

Roberts Coastworker 30 MK2 semi displacement - engine beneath the salon floor

The engine positioned beneath the salon floor.

 

Roberts Coastworker 30 MK2 semi displacement - tidy engine room

  

Roberts Coastworker 30 MK2 semi displacement - looking through from aft deck

Looking through from the aft deck.

 


There are no products to list in this category.