Norfolk 43 Gallery - multi-chine start to finish

Norfolk 43 Gallery - multi-chine start to finish

Roberts Norfolk 43 Gallery

Starting with the standing of frames on the strongback to the completed hull ready for transport.

 

 Roberts Norfolk 43 Gallery - standing of frames on strongback

 

Standing frames on strongback. The strongback in this instance was built by 
setting 2" pipe into cement then after levelling with water level a 3"x3" piece 
of angle has been welded on top.

 

Roberts Norfolk 43 Gallery - frames lined up with string line 

 

Another angle showing the forward half of the boat
Notice centre-line string used to line up each frame exactly

 

Roberts Norfolk 43 Gallery - stringers added

 

 

Roberts Norfolk 43 Gallery - all frames standing getting ready for stringers

All frames standing. Frames being marked and notched for the stringers. 
Some time spent here with a long fairing batten making sure that all frames 
are correctly in position will help ensure a great, fair hull.

 

Roberts Norfolk 43 Gallery - floor webs, keel and stem bar welded in place

Floor webs, keel, and stern bar welded in place.

 

Roberts Norfolk 43 Gallery - chine bars and sheer pipe have been tacked in position

The chine bars and sheer pipe have been tacked in position The frames
have been notched to take the stringers.

 

Roberts Norfolk 43 Gallery - flatting the stringers after bending

When bending the stringers to the curve of the hull the flat bar will often twist.
Giving the bar a few hits with a heavy hammer soon flattens it out again.

 


Refine Search