Spray 28 Gallery - exterior shots of a finished vessel

Spray 28 Gallery - exterior shots of a finished vessel

Spray 28 Gallery

Exterior shots of a finished vessel

This series of photographs are of the Spray 28 "Rosinante" which called in to our home port for a visit a few years back.

 

Spray 28 Gallery - Rosinante in the Burnett River town reach.

Sorry about the quality of this and the last picture on this page. 
Both were taken at twilight and digitally enhanced.

 

pray 28 Gallery - Rosinante preparing to come alongside

Preparing to come alongside..

 

pray 28 Gallery - Rosinante tied up to the marina

Transom installed and ready for turnover.

 

pray 28 Gallery - Rosinante's rigging setup

This picture shows the owners rigging set up. Note the self tacking staysail track
and the turning blocks attached directly to the deck for running the halyard
lines back to the cockpit.

 

pray 28 Gallery - Rosinante deck layout

Things to note : 
Lower shrouds attached to the cabin side. 
Hand rails for gripping and tying spare lines to.
Dorade vents.
Home Made single line self tacking staysail system.

 

pray 28 Gallery - Rosinante neat and tidy bow

 Neat and tidy bow with solid bollard installed.

 

pray 28 Gallery - Rosinante's departure

Departure.

 


There are no products to list in this category.