Spray 30 Gallery - deck, cabin and inside framework p2

Spray 30 Gallery - deck, cabin and inside framework p2

Spray 30 Gallery

Framework of a Spray 28 streched to 30ft ready…

deck, cabin and inside framework p2

 

 Deck and cabin plating

Ready to turn over. Note the framework pre tacked on to support the
 boat level after it has been turned over.

 

Haff over showing the strongback still in position.

 

Here the strongback has been removed. The headstocks still remain.

 

Deck and cabin beams welded into position.

 

Plating has begun

 

 

The cockpit under construction

 

Looking forward with the cockpit fully plated.

 

Looking aft with the cockpit fully plated.

 

The Foredeck area

 

 

 

 

 

 

 Internal Framing

 Compression post terminating onto a 10 mm plate set into deck

 

The lower end of the compression post

 

Looking forward from the companionway

 

Looking forward from the transom past the cockpit and seat.

 

Looking aft towards the transom.

 


There are no products to list in this category.