Spray 22 Gallery - standing and fairing the frames p3

Spray 22 Gallery - standing and fairing the frames p3

Roberts Spray 22 Gallery

Round Bilge wood epoxy version under construction

standing and fairing the frames p3

 

Frames with floors attached and bulkheads ready for hoisting onto the strongback

 

Building the strongback

 

As with most outdoor building some way must be found to make the strongback level.
Here old telephone poles are going to be used.

 

The frames being braced firm at the correct distance apart.

 

Permanent and temporary frames standing

 

Note the notches in the frames to take the keelson

 

Another milestone. The stem fitted in position.

 