Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2
![Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2 Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2](https://www.finelineboatplans.com/image/cache/catalog/power/30mk2/graham/cw30mk2-11-200x200.jpg)
Hull and wheelhouse
Internal Framing
Rails installed. Note the splash rail the Graham has installed.
And the 1/2 pipe rub rail aft.
Above and below. Three shots of this fine vessel showing the extended
wheelhouse Graham has created..
A truly fine job.
Nearly finished interior
With only approximately six weeks to the launching everything is taking shape.
Looking forward down into the V berths.
Neat and functional steering station.
A few loose ends to fix!
The engine positioned beneath the salon floor.
Looking through from the aft deck.
There are no products to list in this category.