Waverunner 44 Gallery - bulkhead door, fuel filler, laminating and rubbing strake - p3
![Waverunner 44 Gallery - bulkhead door, fuel filler, laminating and rubbing strake - p3 Waverunner 44 Gallery - bulkhead door, fuel filler, laminating and rubbing strake - p3](https://www.finelineboatplans.com/image/cache/catalog/power/44wr/paul/wr44-25-200x200.jpg)
Bulkhead Door, Fuel filler, Laminating
Above and below show the engine room entrance under construction
Stainless steel fuel filler pipe welded into side deck.
The above and below shots show salon deck beams being laminated. The
entire coach house is to be constructed out of timber to help reduce weight.
Installing the Rubbing Strake
Thick walled Stainless Steel tube split lengthways. Near the bow this has
been tapered gradually.
Details of the finishing pattern at the aft end of the rubbing strake.
There are no products to list in this category.